Do you need to visit the site?
No. Our assessments are desk studies built on geological mapping, national borehole records, aquifer data and regulatory datasets. Your what3words location and site map tell us exactly where the borehole will go and how much room there is for a drilling rig.
Why does the 20 m³/day threshold matter?
In England, abstracting more than 20 m³ of water a day normally requires an abstraction licence from the Environment Agency. Before drilling and test pumping a borehole for that kind of supply, you also need the Agency's consent to investigate a groundwater source. The larger assessment covers the extra work this involves.
Does the assessment guarantee I'll find water?
No assessment can guarantee a yield, because ground conditions vary over short distances. What it does is give you the best available prediction from the evidence, which greatly reduces the risk of a dry or poor borehole and lets your driller plan properly.
What do I need to do after drilling?
Boreholes deeper than 15 m must be notified to the British Geological Survey. If the water is used for drinking or food production, the supply must be registered with your local council as a private water supply. Your report sets out the steps that apply to you.
Can I upgrade from the <20 m³/day assessment later?
Yes. If your needs change, contact us and we'll scope the additional work needed to bring your assessment up to the >20 m³/day standard.
Who is behind Water Borehole Assessments?
Water Borehole Assessments is a trading name of Aquifer Energy Ltd, a geology and hydrogeology consultancy based in Long Whatton, Leicestershire. See our Terms of Service and Privacy Policy.